Image Upload

File size must be less than 500kb

File types (jpg, png, gif)






New Bridge Open

  • New Bridge Open

Wells Bridge open under traffic control conditions.

The newly built Wells Bridge at Benjeroop is now open under traffic control measures.

Article continues below

Motorists should note that the bridge is still an active work site where the bridge will be closed from 8am till 4pm Monday through to Friday but open all other times with speed restrictions.

The new bridge is a 2-lane concrete structure with increased capacity to withstand high mass loads.

Wells Bridge will be officially opened by Federal Member for Mallee Andrew Broad on the 24th of April at 2pm.